top of page
CitiApprovedEnterpriseVector (1).png

Experience

United States Department of the Air Force
  • Start Date: 09/01/2021

  • Completion Date: 08/03/2026

  • Location:  Shriever, SFB CO

  • Description: 

  • Crane & Hoist Maintenance.

       

US-Army-corps-of-engineers transparent_e
United States Army Corps of Engineers
  • Start Date: 05/02/2022

  • Est. Completion Date: TBD

  • Location:  Ft. Polk, La

  • Description: 

  • 4 Metal Roof Replacements.  Replacing damaged roofs on multiple buildings.

       

US-Army-corps-of-engineers transparent_e
United States Army Corps of Engineers
  • Start Date: 09/24/2018

  • Completion Date: 05/30/2022

  • Location:  Bayou Beouf

  • St. Mary Parish

  • Description: 

  • Atchafalaya Basin Floodway

  • South Chamber Guidewall Replacement

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 3/29/2020

  • Completion Date: 3/29/2020

  • Description:  Plumbing.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 9/24/2019

  • Completion Date: 9/24/2019

  • Description:  CGC Gannet HVAC Vent Cleaning. Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.    

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 7/10/2019

  • Completion Date: 7/10/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.   

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 6/06/2019

  • Completion Date: 6/06/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.   

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 4/15/2019

  • Completion Date: 4/15/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date: 10/01/2021

  • Completion Date: 09/30/2025

  • Location:  USCG Base NOLA

  • Description: Elevator Maintenance.

       

US-Army-corps-of-engineers transparent_e
United States Army Corps of Engineers
  • Start Date: 12/01/2021

  • Est. Completion Date: 10/26/2022

  • Location:  Ft. Polk, La

  • Description: 

  • Building Home of Heroes Recreation Center.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date: 10/01/2020

  • Completion Date: 09/30/2021

  • Location:  Base NOLA

  • Description: 

  • HVAC Maintenance

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 2/11/2020

  • Completion Date: 2/11/2020

  • Description:  CGC Stingray HVAC Vent Cleaning. Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 8/14/2019

  • Completion Date: 8/14/2019

  • Description:  Gas Line Testing and Repair. Locate pressure loss on 24 housing units. Citi pressure tested at 4 psi and monitored. Perform leak testing on all exposed piping and fittings to determine if any leaks are present. After all leaks were identified we repaired or replaced all leaking locations, pressure test system to prove leak free.

       

US-Army-corps-of-engineers transparent_e
United States Army Corps of Engineers
  • Start Date : 6/22/2019

  • Completion Date: 06/22/2019

  • Description:  Apply Fire Retardant Foam Insulation for South Fire Exit Applying DC315 Certified Approved Thermal  over existing foam.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 5/17/2019

  • Completion Date: 5/17/2019

  • Description: CGC Tiger Shark  HVAC Vent Cleaning . Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.  

United States Army Corps of Engineers
  • Start Date : 3/23/2019

  • Completion Date: 3/23/2019

  • Description: Replace Condenser water bypass valves. Install two new valves, clean the flanges and change the actuator.

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date: 10/01/2020

  • Completion Date: 09/30/2023

  • Location:  USCG Base NOLA

  • Description: Ground Maintenance/Landscaping Services.

       

Louisiana Dept of Wildife and Fisheries
  • Start Date: 08/23/2021

  • Completion Date: 11/22/2021

  • Location:  Southeast La Refuges Complex in Lacombe, La

  • Description: 

  • Remove air handler and condenser and replace electrical heat pump systems in main building.

       

US-Army-corps-of-engineers transparent_e
United States Army Corps of Engineers
  • Start Date: 09/25/2020

  • Completion Date: 08/19/2021

  • Location:  Ft. Polk, La

  • Description: 

  • Multiple Roof Replacements.  Bldg 427 & 1830:  Cleaned, repaired, foamed, and sealed.  Bldg 428:  Removed and replaced roof.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 12/5/2019

  • Completion Date: 12/12/2019

  • Description:  HVAC Replacement.  Removed and installed 4 new 7.5 ton Trane 3 phase electric systems. Used a tower crane to remove and lift rooftop unit. We also removed existing disconnect and replaced it with new stainless-steel switch and disconnect power to the existing unit inside and out.

       

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 8/13/2019

  • Completion Date: 10/1/2019

  • Description:  Missouri and Oklahoma Sewage, Exhaust and Water Piping Insulation. Provided service to clean barge boilers and diesel engine exhaust system on the USCG Cutter. Service also included cleaning and servicing the diesel generator exhaust system and re-insulate water pipes.

       

Federal_Aviation_Administration_logo.png
Federal  Aviation  Administration
  • Start Date : 05/2019

  • Completion Date: 6/2019 

  • Description:  Fabricate a new hatch opening for FAA Rador Tower. Installed concrete pad for ladder foundation. Created opening in existing rador grate system to accommodate access to platform, to install new aluminum ladder.  
                         

480px-Seal_of_the_United_States_Coast_Guard.svg.png
United States Coast Guard
  • Start Date : 5/02/2019

  • Completion Date: 5/02/2019

  • Description:  Pump down, clean, refill with new cleaning chemical and empty skim tank for two Parts Washers located at the U.S. Coast Guard.

166DWlaptopcfl458.png
United States Department of Energy
  • Start Date : 3/2019

  • Ongoing: 2019

  • Description: Purchase Order

bottom of page