United States Department of Homeland Security
  • Start Date : 3/29/2020

  • Completion Date: 3/29/2020

  • Description:  Plumbing.

       

United States Department of Homeland Security
United States Department of Homeland Security
  • Start Date : 2/11/2020

  • Completion Date: 2/11/2020

  • Description:  CGC Stingray HVAC Vent Cleaning. Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.

       

  • Start Date : 12/5/2019

  • Completion Date: 12/12/2019

  • Description:  HVAC Replacement.  Removed and installed 4 new 7.5 ton Trane 3 phase electric systems. Used a tower crane to remove and lift rooftop unit. We also removed existing disconnect and replaced it with new stainless-steel switch and disconnect power to the existing unit inside and out.

       

United States Department of Homeland Security
  • Start Date : 9/24/2019

  • Completion Date: 9/24/2019

  • Description:  CGC Gannet HVAC Vent Cleaning. Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.    

       

United States Department of Homeland Security
  • Start Date : 8/14/2019

  • Completion Date: 8/14/2019

  • Description:  Gas Line Testing and Repair. Locate pressure loss on 24 housing units. Citi pressure tested at 4 psi and monitored. Perform leak testing on all exposed piping and fittings to determine if any leaks are present. After all leaks were identified we repaired or replaced all leaking locations, pressure test system to prove leak free.

       

United States Department of Homeland Security
  • Start Date : 8/13/2019

  • Completion Date: 10/1/2019

  • Description:  Missouri and Oklahoma Sewage, Exhaust and Water Piping Insulation. Provided service to clean barge boilers and diesel engine exhaust system on the USCG Cutter. Service also included cleaning and servicing the diesel generator exhaust system and re-insulate water pipes.

       

United States Department of Homeland Security
  • Start Date : 7/10/2019

  • Completion Date: 7/10/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.   

       

United States Department of Homeland Security
  • Start Date : 6/06/2019

  • Completion Date: 6/06/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.   

       

United States Department of Homeland Security
  • Start Date : 4/15/2019

  • Completion Date: 4/15/2019

  • Description:  Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Army Corps of Engineers
  • Start Date : 6/22/2019

  • Completion Date: 06/22/2019

  • Description:  Apply Fire Retardant Foam Insulation for South Fire Exit Applying DC315 Certified Approved Thermal  over existing foam.

       

United States Department of Homeland Security
Federal  Aviation  Administration
  • Start Date : 05/2019

  • Completion Date: 6/2019 

  • Description:  Fabricate a new hatch opening for FAA Rador Tower. Installed concrete pad for ladder foundation. Created opening in existing rador grate system to accommodate access to platform, to install new aluminum ladder.  
                         

United States Department of Homeland Security
  • Start Date : 5/17/2019

  • Completion Date: 5/17/2019

  • Description: CGC Tiger Shark  HVAC Vent Cleaning . Citi cleaned all supply and exhaust portions of the shipboard HVAC ducting system. It required removal of dust, debris, and other contaminants from all ductwork including evaporator coils, blower motors and grills.  

  • Start Date : 5/02/2019

  • Completion Date: 5/02/2019

  • Description:  Pump down, clean, refill with new cleaning chemical and empty skim tank for two Parts Washers located at the U.S. Coast Guard.

United States Army Corps of Engineers
  • Start Date : 3/23/2019

  • Completion Date: 3/23/2019

  • Description: Replace Condenser water bypass valves. Install two new valves, clean the flanges and change the actuator.

United States Department of Energy
  • Start Date : 3/2019

  • Ongoing: 2019

  • Description: Purchase Order

United States Department of Homeland Security
  • Start Date : 2/12/2019

  • Completion Date: 2/12/2019

  • Description: Roof Replacement in Flordia. Citi replaced ridge closure on the USCG administration building. We inspected, resealed and installed additional fasteners to existing ridge closures. Sealed all transitions, overlaps and removed all debris. Secured the new panels to prevent water intrusion.

United States Department of Homeland Security
  • Start Date : 10/9/2018

  • Completion Date: 10/9/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  .

United States Department of Homeland Security
  • Start Date : 10/31/2018

  • Completion Date: 10/31/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Army Corps of Engineers
  • Start Date : 10/25//2018

  • Completion Date: 10/25/18

  • Description: Empty, pressure wash and inspect two white tanks and one Red fuel tank. 

United States Army Corps of Engineers
  • Start Date : 9/2018

  • Ongoing: 2020

  • Description: Atchafalaya Basin Floodway, Bayou Boeuf  South Chamber Guide-wall Replacement. Work consist of demolishing the existing timber piling South Guidewall. We are driving steel pipe piles (18-inch-diameter). Vertical and battered piles to support the structure. We will place precast tubs over the piling and fill them with concrete.

United States Department of Homeland Security
  • Start Date : 9/2018

  • Completion Date: 9/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.   

United States Department of Homeland Security
United States
Air Force Base, MS
  • Start Date : 7/2018

  • Completion Date: 7/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

  • Start Date : 7/2018

  • Completion Date: 7/2018

  • Description: Rental of one (1) one hundred fifty (150) ton crane with an operator, one (1) tractor/trailer with counterweights, one (1) rigger & one (1) signal person.

United States Department of Homeland Security
  • Start Date : 3/2018

  • Completion Date: 3/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

Little Zion  Baptist  Church

  • Start Date : 8/2017

  • Completion Date: 8/2017

  • Description:  Roof Replacement on a commercial building

United States Department of Homeland Security
  • Start Date : 1/2018

  • Completion Date: 1/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 7/2017

  • Completion Date: 7/2017

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Army Corps of Engineers
United States Department of Homeland Security
  • Start Date : 3/2017

  • Completion Date: 3/2017

  • Description:  Re-striping of a "NoParking Zone"

  • Start Date : 12/2016

  • Completion Date: 12/2016

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 9/2016

  • Completion Date: 9/2016

  • Description: Provide a service block up, level up and tie down newly acquired trailers on board of USCG.

United States Department of Homeland Security
  • Start Date : 9/2016

  • Completion Date: 9/2016

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 4/2016

  • Completion Date: 4/2016

  • Description: Clean Coast Guard Boat fuel tank, interior surface and any foreign materials.

United States Department of Homeland Security
  • Start Date : 10/23/2015

  • Completion Date: 10/26/2015

  • Description: Interior build out.

United States Department of Homeland Security
  • Start Date : 6/1/2015

  • Completion Date: 7/02/2015

  • Description: Interior renovation to Admiral House

Coastal Communities Consulting
  • Start Date : 3/17/2015

  • Completion Date: 3/17/2015

  • Description: Electrical installation to a commercial building

United States Army Corps of Engineers
  • Start Date : 11/12/2014

  • Completion Date: 11/12/2014

  • Description: Purchase, transport and off-load Yellow Seatimbers

United States Department of Homeland Security
  • Start Date : 8/2014

  • Completion Date: 8/2014

  • Description: Interior Build Out

United States Department of Homeland Security
  • Start Date : 3/03/2016

  • Completion Date: 3/03/2016

  • Description: Piping: Replace exterior gas lines from riser througout side of wall with stainless steel hardware on 24 units in Grand Isle Housing units.

United States Army Corps of Engineers
  • Start Date : 10/08/2015

  • Completion Date: 11/11/2015

  • Description: Crane Refurbishment. Remove and reinstall two standing cranes by using a 200 ft crane from project site and deliver to shop, for offsite blasting and repainting of crane mast, head, boom and pivot assembly. After reinstallation we performed load testing and put cranes back into service.

United States Department of Homeland Security
  • Start Date : 1/26/2015

  • Completion Date: 2/26/2015

  • Description: Building renovation: Remove & replace metal siding, corroded metal beams on structural frame, spray foam insulation, install new pluming pvc pipes and a new ductless air conditioning & heating system.

United States Army Corps of Engineers
  • Start Date : 10/31/2014

  • Completion Date: 10/31/2014

  • Description: Purchase and deliver Hons office furniture

United States Department of Agriculture
  • Start Date : 7/2014

  • Completion Date: 7/2014

  • Description: Lock change to the exterior of building

CNC Catastrophe & National Claims
  • Start Date : 9/2011

  • Completion Date: 10/2011

  • Description: Evaluate Hurricane Irene flood damaged properties

CNC Catastrophe & National Claims
  • Start Date : 11/2012

  • Completion Date: 1/2013

  • Description: Evaluate Hurricane Sandy flood damaged properties

Seafarers International Union
  • Start Date : 7/2007

  • Completion Date: 7/2007

  • Description: Interior renovation of office building, which included installing stadium lights to exterior

United States Department of Homeland Security
  • Start Date : 6/2018

  • Completion Date: 6/2018

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 10/2017

  • Completion Date: 10/2017

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 7/2017

  • Completion Date: 7/2017

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Army Corps of Engineers
  • Start Date : 11/2016

  • Completion Date: 11/2016

  • Description: Replacement of five broken windows and re-caulking of twenty-five windows. Remove existing caulk for 25 windows and apply new caulking compound.

United States Department of Homeland Security
  • Start Date : 7/2016

  • Completion Date: 7/2016

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Department of Homeland Security
  • Start Date : 12/07/2015

  • Completion Date: 12/07/2015

  • Description: Remove residual product on the U.S. Coast Guard Cutter, gas freeing tank with chemicals and/or high pressure water.  

United States Army Corps of Engineers
  • Start Date : 10/12/2015

  • Completion Date: 10/14/2015

  • Description: Install crushed stone access rod and repair to Jib Cranes at Bayou Dupree Sector gate.

United States Army Corps of Engineers
  • Start Date : 1/05/2015

  • Completion Date: 1/05/2015

  • Description: Purchase and deliver 40 drums of antifreeze.

United States Department of Homeland Security
  • Start Date : 8/2014

  • Completion Date: 8/2014

  • Description: Water damaged remediation to the Officers Barrack

Compu Cure​
  • Start Date : 7/2013

  • Completion Date: 8/2013

  • Description: Exterior and interior renovation

Jefferson Parish Health Unit
  • Start Date : 08/2009

  • Completion Date: 08/2009

  • Description: Renovation to kitchen unit located at the Jefferson Parish Health Unit

Seafarers International Union
  • Start Date : 8/2009

  • Completion Date: 8/2009

  • Description: Flag and Pole installation to commercial building

Residential Clients

  • Numerous Residential Clients

Affiliates: